Construction document review
What changed between two issues.
NABU reads both issues of a project and reports the changes it finds.
Made to your measure: set up for your project and the way you review.
Method
Three steps.
-
Pair the documents
Each document is matched to its twin by number, revision and date.
-
Compare the drawings
Sheet against sheet. Each change is named, pinned and shown side by side.
-
Grade the findings
Major, Medium or Minor, by what is drawn. A reviewer's aid, indicative, not a valuation.
NabuX
Talk to us about your project.
Specialised construction and technical leads and managers. NABU is made by engineers.