The screen shows one sheet of the Architecture set at Level 05. Counts in the left panel are findings per discipline for the whole project; the document list is filtered to the level selected. Marker numbers follow the finding order on the sheet. Reading left to right: where the document sits, what changed, and what the reviewer decided.
Sample · NABU View
Reading a report, finding by finding.
Illustrative sample. Fictitious project data.
NABU View is the viewer for models and reports. Here a report is read: documents by discipline and level, findings by grade, each beside its evidence, with the reviewer's decision recorded. The excerpt below shows one review session.
NABU View
Review session · SF-C-CMP-01 · Architecture
Project
Sampleford Court, Block C
14-storey residential tower with podium. Architecture, Structure and MEP drawings.
Stages compared
Tender issue12 March 2026
Contract issue29 June 2026
Drawing comparison, three disciplines.
Prepared
8 November 2026
1,284 findings · 736 reviewed
736/ 1,284
Findings reviewed
611
Accepted
98
Queried
27
Rejected
SheetContract issue · 29 June 2026
A-C-L05-101 · Rev P03
All 17
Major 3
Medium 6
Minor 8
Tender issue, Rev P01
Contract issue, Rev P03
Markers 1 to 5: findings in this excerpt (5 of 17 on the sheet)
Prepared 8 November 2026 · made with NABU
Sampleford Court, Block C · SF-C-CMP-01 · Review session excerpt
Review decisions and notes are the reviewer's own. Grades are a reviewer's aid, not a valuation, approval or instruction.